Product Features
Buffer Peak Charging Demand
Use stored energy to support high-demand charging periods
Support High-Power DC Charging
Help fast chargers operate more flexibly when grid power is limited
Reduce Grid Stress
Reduce sudden high-power draw from the grid
Improve Charging Flexibility
Support more charging sessions under constrained site conditions
Temporary Power-Constrained Sites
Projects may need charging capacity before grid upgrades are completed
Transformer-Limited Sites
Existing transformers may not support full charging demand
Description
Smart Energy Management
Peak shaving & valley filling: Charge during low-rate hours, discharge during high-demand periods to maximize savings.
Real-time energy distribution optimization for stable and efficient power use.
Compatible with smart grid and IoT systems for future-ready integration.
High-Output Charging Meets Off-Grid Versatility
Function as a powerful EV DC fast charger with 60kW output.
Optional inverter enables home/office power supply—ideal for emergencies, off-grid living, or daily backup, enhancing the versatility of your battery storage system.
Slow charge, fast discharge’ design protects the battery storage and reduces grid dependence.
Reliable in Any Condition
IP54 Rating for dust and water resistance, essential for outdoor dc charging station durability.
Wide operating temperature range with intelligent power adjustment.
Suitable for extreme weather, emergency backup, and remote operations of your EV DC fast charger.
Business Value
Applications
- Urban commercial charging sites: Shopping centers, parking garages and commercial buildings with near-capacity transformers can add DC fast charging capacity without exceeding grid allocations, accelerating infrastructure rollout.
- Remote & rural locations: Highway rest stops, tourist destinations and regional logistics hubs with weak grid access can deploy DC fast charging without waiting for utility grid reinforcement projects.
- Fleet depots: The JT40F supports staggered daytime top-up charging for delivery vans, buses and service fleets, with the battery absorbing low-rate overnight energy to support predictable charging capacity on constrained sites.
- Temporary sites: Construction sites, event venues and emergency response staging areas can deploy this DC fast charger with energy storage as a standalone solution with minimal setup, requiring only basic power access and a level installation surface.
Customization & Packaging Options
Quality & Safety
Why Choose This Energy Storage Integrated Charging Pile
FAQ
A: The JT40F delivers 180kW maximum DC fast charging output, with a 200-1000V DC voltage range and 250A maximum output current.
A: No. Its built-in 200kWh battery pack buffers charging load, allowing operation with standard power access. This eliminates major grid upgrade costs and project delays.
A: It supports CCS1, CCS2, CHAdeMO, DC-GBT and Tesla connectors, covering the vast majority of DC fast-charging EVs globally.
A: The battery charges during low-tariff periods and discharges to support charging during high-demand peak windows, cutting peak demand charges and shifting energy consumption to lower-cost tariff periods.
A: The complete system has an IP54 dust and splash resistance rating for outdoor installation. The internal battery pack carries an IP67 rating for enhanced immersion protection.
A: The 200kWh battery pack uses liquid cooling thermal management, with intelligent temperature adjustment across the -20°C to +50°C operating range.
A: It uses the OCPP 1.6J protocol for central charging management system integration, with optional Ethernet or 4G communication interfaces.
A: Yes, with an optional inverter module, it can supply AC power to homes, offices or facilities during outages for emergency backup and off-grid power use.
A: Customization includes enclosure colors, exterior logos, software interfaces, charging cable length, charging modes, authentication methods and communication interfaces, plus an optional inverter module.
A: It supports RFID cards, QR code mobile app access, VIN-based automatic charging and password start, selectable based on operational requirements.